GREENHILL ENGINEERING CONSULTANTS, INC.
  • Home
  • Corporate Overview
  • Our Services
  • Contact Us
  • Projects
  • Printable SOQ
  • Team Login

Contact Clarifiers at THE Monsanto Water Treatment Plant

Picture
Northeast Alabama Water, Sewer & Fire Protection District first took over the water treatment facility at the Old Monsanto Industrial Plant located on the Tennessee River in 1997.  At that time a 2 MGD packaged water treatment plant was installed.  This project is the first of three phases to upgrade the plant to meet the ever-changing regulations from the EPA.  This project consisted of the construction of a Contact Clarifier to pretreat the raw water prior to filtration.  The clarifiers are 50 feet square, have a depth of approximately 20 feet, and a maximum capacity of 4000 gallons per minute.  The project has been completed and the total construction cost was $2.7 million and is producing a high quality effluent before the water is filtered. 


Client Reference: Mr. John Jordan
2416 Beck Industrial Blvd.
Fort Payne, AL 35968
Office: 256-845-6186
© 2011-2018 Greenhill Engineering Consultants, Inc. All rights reserved.
  • Home
  • Corporate Overview
  • Our Services
  • Contact Us
  • Projects
  • Printable SOQ
  • Team Login